Construction and demolition (C&D) waste accounts for about 30% of all waste produced in Europe and represents one of the waste streams with the highest recovery potential: over 70% of the material produced on a demolition site can be recycled or reused, provided it is managed correctly from the source.
Yet many companies in the sector still do not have a clear understanding of the applicable regulations, the CER codes to use for classification, or the equipment that makes the recycling process economically advantageous. This article addresses all three issues.
Legal notice. The information contained in this article is purely informative and does not constitute legal advice. For the correct application of the regulations to your specific case, it is always advisable to consult a qualified professional (environmental engineer, HSE consultant, RSPP).
What are construction and demolition wastes?
C&D wastes are all materials produced during construction, renovation, demolition, and maintenance activities of buildings, infrastructure, and civil engineering works. The European Waste Catalogue (EWC) classifies them in chapter 17, divided by material type: concrete, bricks, wood, glass, plastic, metals, insulating materials, and hazardous waste.
The distinguishing feature of C&D waste compared to other industrial streams is their heterogeneity: a single construction site simultaneously produces inert materials (concrete, bricks), recoverable materials (metals, wood), materials requiring careful handling (glass, plastics), and often hazardous waste (asbestos, lead, PCBs). Effective management requires the separation of these streams already on site. For more information on separation obligations, please refer to the article on selective demolition and current regulations.
The regulatory framework
The management of C&D waste in Italy is regulated by a multi-level regulatory system that includes European, national, and, in some cases, regional provisions.
D.Lgs 152/2006 — Environmental Consolidated Act, Part IV. Framework regulation on waste management in Italy. It establishes the waste hierarchy (prevention → reuse → recycling → recovery → disposal), classification obligations with CER codes, temporary storage methods, and requirements for transport and disposal. For C&D waste, it imposes the separation of streams and prioritizes recovery over landfill disposal.
Directive 2008/98/EC — EU Waste Framework Directive. Sets the target of 70% recovery by weight for C&D waste by 2020. Introduces the End of Waste principle: a waste ceases to be such when it undergoes a recovery operation and meets specific quality and use criteria. Transposed in Italy by D.Lgs 152/06 and DM 69/2018.
DM 69/2018 — End of Waste for C&D inert materials. Regulates the conditions under which inert C&D waste ceases to be waste and becomes marketable recycled aggregates. It establishes technical requirements (treatment, leaching tests, grading), usage classes (sub-bases, embankments, non-structural concrete), and documentation obligations for operators. It is the regulation that makes on-site recycling economically viable.
The main CER codes for C&D waste
Every waste produced on site must be classified with the correct CER code before being managed, transported, or sent for recovery. Incorrect classification or lack of classification constitutes a violation of D.Lgs 152/06 subject to administrative penalties.
| CER Code | Description | Preferred Destination |
|---|---|---|
| 17 01 01 | Cement | Recovery as recycled inert (EoW DM 69/2018) |
| 17 01 02 | Bricks | Recovery as recycled inert or direct reuse |
| 17 01 03 | Tiles and ceramics | Recovery of inerts; disposal if not recoverable |
| 17 01 07 | Mixed concrete, bricks, tiles | Recovery as mixed inert — lower quality |
| 17 02 01 | Wood | Energy recovery or recycling if untreated |
| 17 02 02 | Glass | Recycling in glassworks or production of rock wool |
| 17 02 03 | Plastic | Material recycling or dedicated disposal |
| 17 04 05 | Iron and steel | Scrapping — high market value |
| 17 04 11 | Electrical cables | Recovery of copper and other metals — authorized operators |
| 17 09 04 | Mixed non-hazardous C&D waste | Landfill disposal for inerts — to be avoided |
Table 1 — Main CER codes for construction and demolition waste with preferred recovery destinations. Codes marked with an asterisk (*) identify hazardous waste: they require mandatory separate management and exclusive assignment to operators registered in the National Register of Environmental Managers.
Equipment for recycling C&D waste
Transforming C&D waste from a problem to a resource requires equipment that allows for the separation, reduction, and classification of materials directly on site. The technologies for excavators available today make this process efficient and competitive compared to simple landfill disposal.
| Equipment | Main Application | Output Produced |
|---|---|---|
| Jaw crusher | Volume reduction of concrete, bricks, asphalt | Recycled inert 0–80 mm for sub-bases and embankments |
| Screening bucket | Separation by size of crushed inert | Homogeneous grain fractions for different destinations |
| Hydraulic shear | Cutting and reducing metal structures | Ferrous scrap ready for scrapping |
| Sorting grab | Sorting by material type on the pile | Separation of flows for specific recovery chains |
| Magnetic separator | Extraction of ferrous metals from crushed inert | Clean scrap + inert purified from metal interference |
| Demolition grab | Separation of concrete from iron reinforcement | Concrete blocks + metal rods already separated at the source |
Table 2 — Main equipment for excavators in the management of C&D waste.
The complete recycling cycle on site
A properly equipped construction site can manage the entire recycling cycle of inerts without leaving the operational perimeter: the demolition grab separates concrete from reinforcement, the crusher reduces raw inert, the magnetic separator extracts ferrous residues, and the screening bucket classifies by size. The result is a recycled aggregate ready for reuse on site or for marketing as secondary raw material under DM 69/2018.
Estimated savings compared to landfill disposal:
- Elimination or significant reduction of transport costs (€15 – €40/t less depending on distance)
- Reduction of landfill disposal costs (€10 – €30/t)
- Valorization of recycled inert as sub-base or aggregate (€5 – €15/t market value)
- Reduction of the environmental impact of the construction site (fewer trips, less CO₂)
- Simplified regulatory compliance: fewer classified wastes correspond to fewer documentation burdens
CMB solutions for C&D waste management
CMB Attachments offers a complete range of excavator equipment dedicated to the management and recycling of construction and demolition waste: crushers, sorting grabs, shears, demolition grabs, and specific accessories for flow separation. All equipment is built with high wear-resistant materials and 100% tested before delivery.
Thanks to the flexibility of quick couplers, the same excavator can be equipped with different attachments during the same workday, covering all phases of the recycling cycle without the need for additional machines.
Frequently asked questions about C&D waste and its recycling
Do I need to keep a register of incoming and outgoing C&D waste produced on site?
Yes, for producers of non-hazardous special waste with more than 10 employees, there is an obligation to maintain a register of incoming and outgoing waste according to Article 190 of D.Lgs 152/06. For smaller companies or specific hazardous flows, the rules vary: it is always advisable to check with your environmental consultant or RSPP.
Can I directly reuse crushed concrete on site without treatment?
Direct reuse of crushed concrete on site without treatment is only allowed in very limited cases and with precise documentation proving the non-hazardous nature of the material. In all other cases, to exit the waste regime, the requirements of DM 69/2018 (End of Waste) must be met: adequate treatment, leaching tests, compliance with quality criteria, and permitted use.
Who can transport C&D waste off-site?
The transport of special waste (including C&D) can only be carried out by entities registered in the National Register of Environmental Managers in the appropriate category. The waste producer (the demolition company) is responsible for the correct classification and the choice of an authorized transporter. Transporting with incorrect CER codes or without registration in the Register is subject to criminal penalties.
How is the actual savings from on-site recycling compared to landfill calculated?
The calculation considers three items: the avoided landfill disposal cost (€ / t × tons produced), the avoided transport cost (€ / km × landfill distance × trips), and the value of the recycled inert produced (€ / t × tons of aggregate compliant with DM 69/2018). From this total, the depreciation or rental cost of the equipment must be subtracted. In many construction sites, the break-even point is already reached from 200–300 tons of treated material.
Do you want to equip the site for recycling C&D waste? CMB offers complete solutions from the demolition grab to the crusher, from the sorting grab to the screening bucket. Request a personalized technical consultation or discover the CMB range for recycling.